The current widest tunnel constructed is the 2 mile long (3.2km) State Route 99 tunnel in Seattle, WA at 17.5m wide, a double deck highway.
It took 4 years to dig (3.2km) and was estimated to cost $1bn/km to construct. It ended up costing more.
The #DougFord fever dream would be a 1.5meters WIDER, and would stretch for 50km (never mind the bunch of ravines and valleys that the 401 traverses).
For context on the costs:
- The #Ontario GDP is about $1.1tr, Ford wants to spend 5% of our annual GDP on one unneeded and unadvised project.
- The Ontario Provincial Budget is about $250bn, that means he wants to spend 1/5th of the entire budget on one unneeded and unadvised project.
Unprecedented!
Meanwhile:
- Ontario's housing starts have fallen thanks to the Ford Administrations meddling.
- Healthcare is increasingly being outsourced with worse outcomes and higher costs.
- Ford is taking over school boards so that he can steal land to hand to his developer donors.
https://www.thestar.com/opinion/contributors/doug-ford-is-getting-distracted-by-just-how-humungous-his-dream-tunnel-would-be-weve/article_947e3070-0de8-438b-871c-374f0d005231.html
#ONPoli #Corruption